Amiri Engineering

Project Listing

Selected Project Experience

Adtran
Ten (10) story structure with 6 and 8 story wings as well as office and manufacturing. Photograph of the Adtran project is included in the heading of our website. Amiri Engineering Corporation performed Geotechnical Engineering and Construction Materials Testing services on Phase III construction. Mr. Nasser Amiri was also Project Manager for Geotechnical Engineering and Construction Materials Testing services for Phases I and II. Foundation types installed on this project have included Spread Footings, Caissons, Augercast Piles and Helical Anchor Piles.

Von Braun Complex, Phase III
Construction Cost: $200,000,000+
Six (6) story office building at Redstone Arsenal, Alabama

Von Braun Complex, Phase II
Construction Cost: $50,000,000
Four (4) story office building at Redstone Arsenal, Alabama

Von Braun Complex, Phase I
Construction Cost: $30,000,000
Four (4) story office building at Redstone Arsenal, Alabama

US Space and Rocket Center, Davidson Center for Space Exploration, Huntsville, Alabama

West Parking Deck, Bridge Street Town Centre
Construction completed in 2007

Hudson Alpha Institute for Biotechnology, Huntsville, Alabama
5 Story Office Buildings (including basement)

Huntsville Hospital
Employee Deck, seven (7) level Parking Deck. Project Completed in 2001.
Tram (Elevated Automated People Mover Project). Project Completed in 2002.
Visitor Parking Deck, seven level Parking Deck completed in 2004.
Elevator Tower, seven story hospital structure.

Franklin Tower
Four (4) Story Office Building and six (6) level Parking Deck. Construction Completed in 2002.

Heart Center Office Building and Parking Deck
Four story concrete framed building with a basement and 6 level parking deck.

University of Alabama in Huntsville
Shelby Center for Science and Technology
Optics Building (4 story concrete frame structure)
Material Science Building (4 story concrete frame structure)
NSSTC ANNEX Addition (4 story concrete frame structure)
Residence Hall, ( 4 story concrete frame structures)

Oakwood College, Huntsville, Alabama
Four (4) story dormitory project. Project completed in 2008.

Municipal Justice and Public Safety Center, Huntsville, Alabama
Construction completed in 2000.
Construction Cost: $24,000,000

Missile and Space Intelligence Center
Redstone Arsenal, Alabama
Construction Cost: $25,000,000
Project completed in 2000.

Life Cycle Software Engineering Center Project
Redstone Arsenal, Alabama
Construction Cost: $27,000,000
Project completed in 2000.

South Hall for Von Braun Center
Huntsville, Alabama
Construction Cost: $25,000,000+
This project consisted of a 100,000 square feet elevated Exhibition Hall over a Parking Garage. Subsurface conditions for this project consisted of highly solutioned limestone and shallow groundwater condition. Due to upper soft dumped fill and shallow groundwater conditions, extensive stabilization for garage was required. About 275 Caissons were installed on this project with Caisson depths ranging from 30 to 80+ feet.

Sparkman Center Addition
Redstone Arsenal, Alabama
A 3 story and a 5 story administrative office buildings. Foundations for these structures consisted of Geopiers (densified stone columns). This was the 1st project in Northern Alabama which utilized this foundation system.

AmSouth Tower
Huntsville, Alabama
11 story office building with a 6 level parking deck
Mr. Nasser Amiri, PE, was the project manager/Principal Engineer on this landmark structure in Huntsville, Alabama

Rankin Fite/Marion County Airport
Runway Extension and Taxiway and Apron Construction

Russellville Airport
Runway and Taxiway construction

ST. Clair County Airport
Runway Extension and Taxiway Construction (2003)

Posey Filed Airport
Runway and Taxiway Resurfacing

Northrup Grumman, Voyager Way, Huntsville, Alabama
4 Story Concrete Framed Structure

Digium, Inc., Jan Davis Drive, Huntsville, Alabama

2609 Artie Street SW • Huntsville, Alabama 35805 • Telephone: (256) 536-9992 • Fax: (256) 536-9982
© 2008 by Amiri Engineering